Phase I: The Terrestrial Bridge (Earth Operations)
Infrastructure: Construction of the 48.5 km electromagnetic track on Mount Chimborazo, Ecuador.
Energy Hub: Integration of a 500 MW solar farm and 200 MW wind supplement for carbon-neutral launches.
Goal: Achieving a launch frequency of 365 missions per year, reducing orbital delivery costs to $7.3 per kg.
Phase II: The Lunar Gateway (Lunar Operations)
Sustainable Settlement: Establishing the first permanent human habitat using 3D-printed regolith structures.
In-Situ Resource Utilization (ISRU): Utilizing EMLS to deliver mining equipment for water and mineral extraction on the lunar surface.
Space Hub: Positioning the Moon as a strategic logistics hub for deep space exploration, including missions to Mars and beyond.